The industrial and administrative buildings were designed and constructed using an industrial system of pre-fabricated concrete elements. Specific pre-fabricated systems were also adopted for the technical areas, including the water reserve for consumption and fire, the transformer station, and the generator.
This approach led to a significant reduction in both project duration and cost, while effectively addressing the pertinent complexities inherent in the industrial installation.
Santarém – Alpiarça |
Texsa, SA | 2007
Texsa Industrial Installations
The industrial and administrative buildings were designed and constructed using an industrial system of pre-fabricated concrete elements. Specific pre-fabricated systems were also adopted for the technical areas, including the water reserve for consumption and fire, the transformer station, and the generator.
This approach led to a significant reduction in both project duration and cost, while effectively addressing the pertinent complexities inherent in the industrial installation.
Download Project SheetSantarém - Alpiarça
Santarém - Alpiarça
Texsa, SA | 2007